Case Study
Infrastructure Steel & Tube Systems
Sequenced deliveries, processed components, and documentation for a large infrastructure project.
Stock Check
Confirm alloy, form, and size availability with mill cert alignment.
Request AvailabilityLogistics & JIT
Set up kanban, consignment, and labeled kitting for production lines.
Logistics ProgramsChallenge
A contractor required structural steel, tube systems, and fittings delivered in build sequence to reduce onsite labor and avoid schedule slips.
Solution
- Pre-cut and marked components with protective packaging by erection phase.
- Pipe and tube systems supplied with documentation and labeling for fast identification.
- Delivery calendar aligned to site milestones with JIT shipments.
Results
- Reduced onsite cutting and rework, accelerating installation.
- Improved QA through clear documentation and heat number traceability.
- On-time milestone completion due to reliable JIT deliveries.
Deliver Your Project On Schedule
Pair pre-processed materials with sequenced logistics to minimize site delays.