Case Study

Infrastructure Steel & Tube Systems

Sequenced deliveries, processed components, and documentation for a large infrastructure project.

Availability 12 Service Centers

Rapid stock check + cut-to-size

Quality ISO 9001 | AS9100D

Full traceability & cert packets

Support 24/7 RFQ Desk

Engineering-assisted sourcing

Stock Check

Confirm alloy, form, and size availability with mill cert alignment.

Request Availability

Processing Window

Book saw, waterjet, or CNC slots to match your build schedule.

View Capabilities

Certifications

Download ISO 9001, AS9100D, and compliance documentation.

Quality & Compliance

Logistics & JIT

Set up kanban, consignment, and labeled kitting for production lines.

Logistics Programs

Challenge

A contractor required structural steel, tube systems, and fittings delivered in build sequence to reduce onsite labor and avoid schedule slips.

Solution

  • Pre-cut and marked components with protective packaging by erection phase.
  • Pipe and tube systems supplied with documentation and labeling for fast identification.
  • Delivery calendar aligned to site milestones with JIT shipments.

Results

  • Reduced onsite cutting and rework, accelerating installation.
  • Improved QA through clear documentation and heat number traceability.
  • On-time milestone completion due to reliable JIT deliveries.

Deliver Your Project On Schedule

Pair pre-processed materials with sequenced logistics to minimize site delays.